This supports single page PDF or single page image files(png).
./deploy.sh DEV ocr-tesseract
curl -v http://localhost/async-function/ocr-tesseract \
-H "id:f985a551-d590-4da3-8e82-6d4b9a71a83b" \
-H "page:5" \
-H "file_path: BLOCKAERO/sample/f985a551-d590-4da3-8e82-6d4b9a71a83b/f985a551-d590-4da3-8e82-6d4b9a71a83b_page005.pdf" \
-H "X-Callback-Url: http://webhook/"
{
"action": "ocr_preprocessing",
"endpoint": "ocr-tesseract",
"id": "c7fa1e1c-4b5f-11e9-91ed-02420a000019",
"page": 1,
"input": "BLOCKAERO/sample/c7fa1e1c-4b5f-11e9-91ed-02420a000019.pdf",
"total_time_taken": 2.5422966480255127,
"status": 200,
"next_action_response": 202,
"next_action": "ocr-tesseract",
"result": {
"thumbnail": "BLOCKAERO/sample/c7fa1e1c-4b5f-11e9-91ed-02420a000019_tn.png",
"highdpi": "BLOCKAERO/sample/c7fa1e1c-4b5f-11e9-91ed-02420a000019.png",
"highdpi_sha256": "e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855"
}
}
{
"action": "ocr",
"endpoint": "ocr-tesseract",
"id": "c7fa1e1c-4b5f-11e9-91ed-02420a000019",
"page": 1,
"input": "BLOCKAERO/sample/c7fa1e1c-4b5f-11e9-91ed-02420a000019.pdf",
"result": {
"text": "r\n\n \n\n* 1. Approving National Aviation] 2 3. Form Tracking\n\nAuthority/Country: AUTHORIZED RELEASE CERTIFICATE Number\n\n \n\n \n\n \n\n \n\n \n\nFAA/UNITED STATES FAA Form 8130-3 AIRWORTHINESS APPROVAL TAG 1387105669\n4. Organization Name and Address: 5.Wark Order/Contract/\nIAE INTERNATIONAL AERO ENGINES AG PRATT & WHITNEY GEORGIA DISTR. CENTER Invoice Number\n628 HEBRON AVE., SUITE 400 3781 SOUTHSIDE INDUSTRIAL CT SE FAA APPROVAL HOLDER 87105669\nGLASTONBURY, CT 06033 USA ATLANTA, GA 30354-3218 US PRODUCTION CERTIFICATE NUMBER 114NE\nGjitem| 7 Description 8 Part Number OG Eligibility * 10. Quantity it. Serial/Batch Number [12 Status/Vork\nBLADE-TURBINE 2A3838 CONTD | PKLBL80276\nPKLBL80382\nPKLBL80394\nPKLBL80592\nPKLBLW2532\nPKLBLW2548\nPKLBLW2656\nPKLBLW2667\nPKLBLW2730\nPKLBLW2788\n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n13. Remarks: Page 6 of 7\nEXPORT DIRECT SHIPMENT AUTHORIZATION\n\n \n\n14. Certifies the items identified above were manufactured in conformity ta:\n{x Approved design data and are in @ condition for safe operation\nC1 Non-approved design data specified in Black 13.\n\nFA\n15. Alithorized. Sienpture 16. Approval Authorization No:\noe Pill ODA400098NE\n\n17. NamefTyped or Printed): 18. Dateim/d/y):\n\nDAVID A HENRY IAPR/01/2013\n\nUser/Installer Responsibi Hes:\n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\nIr is important to understand that the existence of thig Decument alone does not automatically constitute authority to install the partfcomponent/assembly.\n\nWhere the user/instailer performs work in accordance with the national regulations of an airworthiness authority different than the airwerthiness authority of the country specified in Block\n1, fC is essential that the user/installer ensures that his/her airworthiness authority accepts parts/components/assemblies from the airworthiness authority of the country specified in Block\nt\n\nStatements in Block 14 and 19 do net constitute installation certification. In all cases, aircraft maintenance record must contain ar installation certification issued in accordance with the\nnational ragulations by the user/installer before the aircraft may be flown.\n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\nFAA Form 8130-3(6-01) *Installer must cross check eligibility with applicable technical data NSN: 0052-00-01 2-9005\n1. Approving National Aviation: 2. 3. Form Tracking\nAuthority/Country: AUTHORIZED RELEASE CERTIFICATE Number\nFAA/UNITED STATES FAA Form 8130-3 AIRWORTHINESS APPROVAL TAG 1387105669\n4. Organization Name and Address: \u00a7.Work Order/Contract/\nIAE INTERNATIONAL AERO ENGINES AG PRATT & WHITNEY GEORGIA DISTR. CENTER invoice Number\n628 HEBRON AVE., SUITE 400 3781 SOUTHSIDE INDUSTRIAL CT SE FAA APPROVAL HOLDER 87105669\nGLASTONBURY, CT 06033 USA ATLANTA, GA 36354-3218 US PRODUCTION CERTIFICATE NUMBER 114NE\nS.jtem|_ 7 .Oeseription $.Part Number Eligibility * 10 Quantity Li Serial/Batch Number 12. StatusWork\nBLADE-TURBINE 2A3838 CONTD PKLBLW2796\nPKLBLW2878\nPKLBLW2881\nPKLBLW2969\nPKLBLW2977\n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\n13. Ramarks: Page 7 of 7\nEXPORT DIRECT SHIPMENT AUTHORIZATION\n\n \n\n14. Cartifies the items identified above were manufactured in conformity to:\n\n \n\n \n\n \n\n \n\n \n\n \n\n \n\nix Approved design data and are in a candition tor safe operation\nL1 Non-approved design data specified in Block 13.\nfh\n15. ee rl 18. Approval Authorization Ne:\n: A\nODA4O0O0098NE\n\n17. Name{Typed or Printed): 18. Datetm/dfy):\nDAVID A HENRY AAPR/O1/2013\n\n \n\n \n\n \n\nUser/installer Responsibilities:\n\nIt is important to understand that the existence of this Cacument alone does not automatically constitute authority to install the part/component/assembly,\n\nWhere the usercinstaller performs work in accordance with the national regulations of an airworthiness authority different than the airworthiness authority of the country specified in Block\n\u00a5, it is essentiat that the userfnstaller ensures that his/her airwerthiness authority accepts parts/components/assemblies from the airworthiness authority of the country specified in Block\n1\n\n \n\nStatements in Block 14 and 18 do not constitute installation certification. tn all cases, aircraft maintenance record must contain an installation certificatian issued In accordance with the\nnational regulations by the user/installer before the aircraft may be flown.\n\nFAA Form 8130-3/6-011 *Installer must cross check eligibility with applicable technical data NSN: 0652-00-07 2-9005\n\n \n\n \n\n \n\f"
},
"status": 200,
"total_time_taken": "6.431158065795898",
"next_action": "classify-fasttext",
"next_action_response": 202
}
Content type
Image
Digest
Size
935.3 MB
Last updated
about 6 years ago
docker pull blockaero/ocr-tesseract:k8s