Sign inSign up

mjstealey/docker-modflow

By mjstealey

•Updated about 10 years ago

Docker implementation of MODFLOW-2005-v.1.11.00

Image
1

10K+

mjstealey/docker-modflow repository overview

⁠docker-modflow

Docker implementation of MODFLOW-2005-v.1.11.00⁠

Based on source code⁠ for Unix file structure

⁠Pull the precompiled image from Docker Hub

The docker image⁠ is automatically built on commit to this repository at Docker hub. Docker Hub is a cloud hosted service from Docker that provides registry capabilities for public and private content. Learn more about Docker⁠ and Docker Hub⁠.

docker pull mjstealey/docker-modflow

⁠Usage:

Invoke mf2005 MYFILE.nam execution where MYFILE.nam = name of the MODFLOW name file for the simulation. This is achieved by sharing your local MODFLOW input files from a directory on the host that we'll call /LOCALPATH, and the docker-modflow instance will mount this as /workspace internally. The resulting output .lst file will be written to the shared /LOCALPATH directory.

docker run --rm --env-file sample-env-file.env -v /LOCALPATH:/workspace mjstealey/docker-modflow mf2005 MYFILE.nam 
  • Sample environment file sample-env-file.env (Update as required for your installation)

    WORKER_UID=
    WORKER_GID=
    

    About UID/GID: The docker container will operate as the root user if both the WORKER_UID and WORKER_GID variables are left blank. If these variables are defined, the container will operate a worker user with the specified UID and GID. If only one varialbe is set the container will operate as a worker user and default the unset UID or GID to a value of 999. This is useful when operating on a system where read/write permissions of a shared volume on the host need to be respected.

Example 1: Say we want to run a set of input files where the name file is bcf2ss.nam and it's located within our local directory /mydirectory.

$ ls /mydirectory/ -1
bcf2ss.ba6
bcf2ss.bc6
bcf2ss.dis
bcf2ss.nam
bcf2ss.oc
bcf2ss.pcg
bcf2ss.rch
bcf2ss.riv
bcf2ss.wel

We can invoke the call by mapping the shared volume as -v /mydirectory:/workspace and specify the execution of MODFLOW on our bcf2ss.nam as mf2005 bcf2ss.nam in the following way: (The container will operate as root since WORKER_UID and WORKER_GID were not specified, thus all output files will be owned by root)

$ docker run --rm -v /mydirectory:/workspace mjstealey/docker-modflow mf2005 bcf2ss.nam

                                  MODFLOW-2005
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013

 Using NAME file: bcf2ss.nam
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/27 18:29:16

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     1    Ground-Water Flow Eqn.
 Run end date and time (yyyy/mm/dd hh:mm:ss): 2016/09/27 18:29:16
 Elapsed run time:  0.013 Seconds

  Normal termination of simulation

Upon successful completion the user will now find the resultant bcf2ss.lst output file in their local /mydirectory.

$ ls /mydirectory/ -1
bcf2ss.ba6
bcf2ss.bc6
bcf2ss.dis
bcf2ss.lst    <-- Output file
bcf2ss.nam
bcf2ss.oc
bcf2ss.pcg
bcf2ss.rch
bcf2ss.riv
bcf2ss.wel

Example 2: Say we want to run a set of input files where the name file is UZFtest2.nam and it's located within our local directory /mydirectory, and we want to enforce ownership of the output files to a local user with UID=1000 and GID=1000.

$ ls /mydirectory/ -1
UZFtest2.ba6
UZFtest2.dis
UZFtest2.gag
UZFtest2.ghb
UZFtest2.lpf
UZFtest2.nam
UZFtest2.oc
UZFtest2.sfr
UZFtest2.sip
UZFtest2.uzf
UZFtest2.wel

Set sample-env-file.env as:

WORKER_UID=1000
WORKER_GID=1000

We can invoke the call by mapping the shared volume as -v /mydirectory:/workspace and specify the execution of MODFLOW on our UZFtest2.nam as mf2005 UZFtest2.nam in the following way:

$ docker run --rm --env-file sample-env-file.env -v /mydirectory:/workspace mjstealey/docker-modflow mf2005 UZFtest2.nam

                                  MODFLOW-2005
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013

 Using NAME file: UZFtest2.nam
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/27 18:20:26

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     4    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     5    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     6    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     7    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     8    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     9    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:    10    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:    11    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:    12    Time step:    15    Ground-Water Flow Eqn.
 Run end date and time (yyyy/mm/dd hh:mm:ss): 2016/09/27 18:20:33
 Elapsed run time:  7.625 Seconds

  Normal termination of simulation

Upon successful completion the user will now find the resultant output files in their local /mydirectory with the resultant output file onwership set to UID=1000 and GID=1000.

$ ls /mydirectory/ -1
UZFtest2.ba6
UZFtest2.dis
UZFtest2dv.sg9  <-- Output file
UZFtest2.flw    <-- Output file
UZFtest2.gag
UZFtest2.ghb
UZFtest2hd.out  <-- Output file
UZFtest2.lpf
UZFtest2.lst    <-- Output file
UZFtest2.nam
UZFtest2.oc
UZFtest2.sfr
UZFtest2.sg1    <-- Output file
UZFtest2.sg2    <-- Output file
UZFtest2.sg3    <-- Output file
UZFtest2.sg4    <-- Output file
UZFtest2.sg5    <-- Output file
UZFtest2.sg6    <-- Output file
UZFtest2.sg7    <-- Output file
UZFtest2.sg8    <-- Output file
UZFtest2.sip
UZFtest2.uzf
UZFtest2.uzf1   <-- Output file
UZFtest2.uzf2   <-- Output file
UZFtest2.uzf3   <-- Output file
UZFtest2.uzf4   <-- Output file
UZFtest2.uzfot  <-- Output file
UZFtest2.wel

Alternately environment variables can be passed into the docker run call as arguments instead of using an environment file. Using the same example UID=1000, GID=1000 we would make the docker run call like this:

$ docker run --rm \
  -e WORKER_UID=1000 \
  -e WORKER_GID=1000 \
  -v /mydirectory:/workspace \
  mjstealey/docker-modflow mf2005 UZFtest2.nam

Validation of the model: To test the validity of the model we will iterate over all .nam files found in the test-run directory If the container is run without any additional parameters. Samples of the expected output .lst files are found in the test-out directory and can be used for comparison as needed.

docker run --rm mjstealey/docker-modflow

Example 3: This is the output that would be recieved by the user in the console if the docker-modflow container were invoked without any additional parameters.

$ docker run --rm mjstealey/docker-modflow

### RUNNING TESTS ###
RUN: MNW2-Fig28.nam

                                  MODFLOW-2005     
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013                        

 Using NAME file: MNW2-Fig28.nam 
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 21:54:45

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:    12    Ground-Water Flow Eqn.
 Run end date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:00:00
 Elapsed run time:  5 Minutes, 14.424 Seconds

  Normal termination of simulation
RUN: UZFtest2.nam

                                  MODFLOW-2005     
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013                        

 Using NAME file: UZFtest2.nam 
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:00:00

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     4    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     5    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     6    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     7    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     8    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:     9    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    10    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    11    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    12    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    13    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    14    Ground-Water Flow Eqn.
 Solving:  Stress period:     2    Time step:    15    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     1    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     2    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     3    Ground-Water Flow Eqn.
 Solving:  Stress period:     3    Time step:     4    Ground-Water Flow Eqn.
...
...
RUN: twri.nam

                                  MODFLOW-2005     
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013                        

 Using NAME file: twri.nam 
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:02:13

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Run end date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:02:13
 Elapsed run time:  0.005 Seconds

  Normal termination of simulation
RUN: twrihfb.nam

                                  MODFLOW-2005     
    U.S. GEOLOGICAL SURVEY MODULAR FINITE-DIFFERENCE GROUND-WATER FLOW MODEL
                             Version 1.11.00 8/8/2013                        

 Using NAME file: twrihfb.nam 
 Run start date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:02:13

 Solving:  Stress period:     1    Time step:     1    Ground-Water Flow Eqn.
 Run end date and time (yyyy/mm/dd hh:mm:ss): 2016/09/23 22:02:13
 Elapsed run time:  0.005 Seconds

  Normal termination of simulation
RUN: twrip.nam

                                  MODFLOW-2005     
    U

Tag summary

Content type

Image

Digest

Size

109.2 MB

Last updated

about 10 years ago

docker pull mjstealey/docker-modflow